Home › Forums › Public Discussion › Gas Boiler – Hot Water Base Board › Reply To: Gas Boiler – Hot Water Base Board
05-28-14 at 12:03 PM
#2474
Guest
Materials shall be rated for the operating temperature and pressure of the hydronic system and be suitable for the type of fluid in the hydronic system. [See VMC 1202.3]
The hydronic piping shall conform to the standards listed in table 1202.4 . [See VMC 1202.4]
VBOCA Member DAVID……… CBO